Major turbine order placed

Red Rock Power has placed a 67 MW order with Vestas for its Benbrack wind farm, following an initial exclusivity agreement last month. The order includes the supply, installation and commissioning of 13 V136-4.5 MW turbines and two V117-4.2 MW turbines in 4.3 MW operating mode. Deliveries and installation of the turbines will begin in early 2024, with commissioning complete that summer. Red Rock’s onshore Benbrack wind farm, located in Dumfries and Galloway, has consent for up to 18 turbines and a total generation capacity of 72 MW, allowing for the potential to increase the number of turbines.
For further information redrockpower.co.uk