Wind tower manufacturing line installed

Spanish wind-tower manufacturer, GRI Renewable Industries, has installed an automated PEMA production line for offshore wind turbine towers.

The line includes seven PEMA extra heavy-duty column and booms, one PEMA double-head welding platform, 32 pairs of heavy PEMA roller beds (up to 350,000 kg and 10 m diameter), four PEMA assembly lines, a plate joining station, and milling machines for longitudinal and circular joints. The ethos of the line is that all crucial processes, such as welding, milling and materials handling, are fully integrated to constitute efficient workflow and high quality.
For further information www.pemamek.com