Among the UK’s leading structural engineering and metal fabrication companies, Tranent-based Had Fab has built one of the company’s largest constructions to date. The 16.5 m long, 3.5 m wide and 4 m high piling frame will form part of the high-profile redevelopment of Stornoway Deep Water Terminal. Working to a tight deadline, Had Fab fully refurbished and converted the frame (from H-pile to tubular pile configuration) so as to successfully install 1220 diameter piles, up to 44 m long on the Stornoway Deep Water Terminal. The structure is now fully operational.
For further information www.hadfab.co.uk